Location
Highlights Of Corrosion Control
&
Cathodic Protection Projects

Dates

Tehran

Auto Body Cathodic Protection System

1997

Ahar

Survey, Design, Supervision & Commissioning for water reticulation
(Satarkhan Dam)

1998
Karaj Survey,Design,Supply & Construction for water pipeline (61KM) 1998

Tehran

Intelligent Cathodic Protection System

1998

Ahvaz Shoaibieh Survey, Design, Supply & Construction for fuel pipeline 1999
All over the IRAN Corrosion Control Systems for Transmitter Tower (IRIB) 1999
Zahedan Survey & Commissioning for water pipeline (192KM) 2000
Zirab Survey, Design, Supervision & Commissioning for water pipeline 2000/2001
Mahshahr port Repairing of Cathodic Protection System for 8 jetties,20 off shore stations and 18 light houses

2002/2003
Saveh Survey and Commissioning for water pipeline 2002
North of Tehran Survey and Commissioning for potable water supply pipeline 2002
South Pars (Total) Installation Cathodic Protection System for Phase 2&3

2000/2001
Tabriz Survey, Design and Construction of Cathodic Protection System for underground pipeline and storage tanks - Sahand power plant

2003
Abadan

Full Survey (Pipeline and Coating Integrity) and Technical Inspection for Abadan-Arvand water pipeline (52KM)

2003
Azna Survey & Construction of Cathodic Protection System for gas pipeline (63 KM) 2003

Khark Island

Survey, Design, Supply & Construction for 2 jetties

2004

Semnan

Survey, Supply & Construction for phase II Semnan water pipeline (31 KM)

2005

Koohrang

Survey, Design, Supply & Construction for Koohrang-Shahr-e Kord water pipeline (92 KM)

2004/2005
Lavasan

Survey, Design, Supply & Construction for water pipeline
(2000mm-14 KM)

2004/2005
Karaj

Survey, Design, Procurement & Construction of Cathodic Protection System for Mahestan Shopping Center (Concrete Structure)

2005
Sari

Survey, Design, Supply & Construction for Sari-Neka oil pipeline
(36 KM)

2005
Ardebil Survey & Design for water reticulation (Ardebil Dam) 2005
Tabriz Inspection Survey (DCVG+CIPS) for Zarrrine rood-Tabriz PCP water pipeline (2000mm-40 KM)

2007
Arak Survey, Design, Supply & Construction for Kamal Saleh-Arak water pipeline (1000mm-78 KM)

2007/2008
Mashad Survey, Design, Supply & Construction for Doosti Dam-Mashad water pipeline (2000mm-180 KM)

2008/2009
Jolfa Survey, Design, Supply & Construction for Golfaraj field water pipeline (2000mm PC & steel pipeline)

2008/2009
Bandar Abbas Inspection Survey (DCVG+CIPS) for Bandar Abbas-Qeshm gas pipeline (12inch - 69KM)

2009
Zanjan Inspection Survey (DCVG+CIPS) for Ray-Tabriz oil pipeline
(14inch - 22KM)

2009
Shahid Bahonar harbor Survey, Design, Supply & Construction for C1 & C5 Jetties

2009
Esfahan Inspection Survey (DCVG+CIPS) for Esfahan-Yazd gas pipeline
(30inch - 75KM)

2009
 
 
 